Join our mailing list!









Realex logoGHlogo

  Home > Contract Law >

  Quantifying and managing disruption claims
Jacket image Quantifying and managing disruption claims, ISBN 9780727731654, which building contract


 
List Price: £50.00
Saver Price £47.00
Sale Price: £47.00
Save £3.00!

Product Code: 9780727731654
Qty:

Description
 
Hamish Lal, Freshfields Bruckhaus Deringer, Construction and Engineering Group
ISBN: 9780727731654
Format: Hardbound
Publish Date: 17/12/2002
Publisher: Thomas Telford Ltd
Page Size: 234x156mm
Number of Pages: 320

Description
Claims involving disruption are commonly accepted to be the most difficult to quantify. Disruptions that occur during a working day can lead to productivity loss which, in turn, can lead to time and cost overruns. If the disruption consumes the entire float in an activity, then disruption can cause a delay to project completion and lead to claims for extensions of time. Contractors of all tiers, concerned that they have lost money, troubled by the threat of liquidated damages or simply because the conditions of contract allow, submit claims for loss/expense and (in the worst case scenarios) extensions of time. The accurate quantification of the time and cost effects of such disruption is typically prevented because the role of labour/resource productivity is not fully recognised, site labour productivity is not correctly measured (if at all) and, finally, because the relationship between, in practice, the bill of quantities items (cost) and programme activities (time) is not direct or transparent.

The solution proposed in this book integrates cost and time in order to develop a site labour productivity measurement system whereby claims involving disruption can be objectively and automatically quantified. It is a practical text that challenges the current construction industry cost and time estimating methods, demystifies the measurement of site labour/resource productivity and – in line with the Society of Construction Law Delay and Disruption Protocol launched in October 2002 – puts forward a rational and sufficiently accurate method of quantifying the effects of disruption in terms of both cost and time. Through the use of the solution on four very different demonstration construction projects, this book provides worked examples and tangible evidence of how the solution is designed to operate in practice.

Disruption claims often impact on the whole of the construction industry and so this book has been specifically written for anyone who is involved in submitting, evaluating, awarding, managing and resolving disruption claims.

Contents

   * Introduction
   * Construction contract disruption claims
   * Cost and time modelling
   * Demonstration stage 1: The development of cost and time models built around labour/resource productivity
   * Demonstration Stage 2: The development of a disruption and site labour productivity measurement scheme
   * Demonstration Stage 3: Measuring disruption and site labour productivity in practice
   * Demonstration Stage 4: Quantifying the effect of disruption on site labour prodctivity
   * Demonstration Stage 5: Managing disruption and improving site labour productivity
   * Demonstration Stage 6: Practical use of productivity measurements in quantifying disruption
   * Quantifying disruption: The legal issues

Share your knowledge of this product with other customers... Be the first to write a review

Browse for more products in the same category as this item:

Contract Law