ICC Network Rail NR8 Measurement Version

ICC Measurement Version Incorporating Network Rail NR8 Track Amendments, £30.50 and Free postage, ISBN 9781907660733, Which Building Contract
ICC Rail Track Measurement Version, Incorporating NR8 Track Amendments


 
List Price: £33.00 RRP
Our Price: £30.50 Best Industry Price
Save £2.50!


Availability: Usually Ships in 24 Hours
Product Code: 9781907660733
Qty:

Description
 
Publisher: ACE/CECA
Format: Paperback
Pages: 61
ISBN: 9781907660733
Published: 06/10/2014
Measurement Version - (with payment amendments October 2011) Incorporating NR8 Track Amendments
This Network Rail Version of the Infrastructure Conditions of Contract Measurement Version incorporating NR8 Track amendments includes bespoke amendments drafted specifically for Track works.
The ICC contract has been drafted with the co-operation of Network Rail to provide  a standard form  of contract for use as part of Network Rails new Plain Line contracts strategy for Track.
The opportunity has been taken to refine and update the NR8 amendments that have been incorporated to ensure a contract designed to deliver efficiencies in resource and expenditure.
The new contracts are more concise, easier to read and follow a more logical sequence.
They now include early warnings measures and encourage mutual trust and co-operation within the legal text.
In addition the contracts have been future proofed, accommodating issues such as BIM in a flexible way which will ensure the contract remains relevant no matter the level of BIM maturity.
ICC contracts are a cost-effective way to create a professional and flexible environment for those working to deliver infrastructure projects.
Stephen Blakey, commercial projects director for Network Rail said that following successful co-operation between ICC and Network Rail, they were delighted that these new contracts will build  a stronger environment of trust and will be welcome news o practitioners and stakeholders across the supply chain.
The ICC contracts are a cost-effective way for contractors, consultants and engineers to mitigate risk, create trust and confidence to deliver major projects.
Amendments for the ICC Network Rail Measurement Version include:
•A significantly revised Definitions clause to accommodate the particular requirements for Track
•Replacement of the Engineer with an Employers Representative
•A payment process which, whilst complying with current legislation, reflects NR practice regarding interim payment and payment in the event of cancellation of Core or other Works
•Changed completion procedures
•Changes to the valuation process
•Track possessions and isolations
•Provisions relating to the Claims Allocation and Handling Agreement
•The sharing of cost information
•The dispute resolution process
This Version does not replace the Measurement Version and is specific to the Works mentioned herein.
ICC Measurement Version Guidance Notes August 2011 are not fully compatible with the NR8 Track Version
List Price £33.00

Share your knowledge of this product with other customers... Be the first to write a review

Browse for more products in the same category as this item:

ICC Contracts
ACE Contracts Bookshop > ICC Contracts
ACE Contracts Bookshop
Measurement Contracts