Home > JCT Contracts > JCT 2016 Contracts >

Design and Build Sub-Contract Conditions (DBSub/C)

JCT Design and Build Subcontract Conditions 2016 (DBSub/C), ISBN 9780414054639, Publisher Sweet & Maxwell, Joint Contracts Tribunal, Which Building Contract Bookshop,
JCT Design and Build Sub-Contract Conditions 2016 (DBSub/C)


 
List Price: £68.48 (£57.07 exc VAT) RRP
Our Price: £63.68 (53.07 exc VAT) Best Industry Price
Save £4.80!


Availability: Usually Ships in 24 Hours
Product Code: 9780414054639
Qty:

Description
 
Publisher: Sweet & Maxwell
Date Published: Sep 2016
ISBN: 9780414054639
Binding: Paperback

Current edition: DBSub/C 2016
Previous editions: DBSub/C 2011, DBSub/C 2005 (Revision 2 2009)

JCT Design and Build Sub-Contract Agreement 2016 (DBSub/C)

The Design and Build Sub-contract is designed to be used where the main contract is the Design and Build Contract. It can be used where the sub-contracted works are fully designed, or if the sub-contractor is required to design all or a part of the works.

The Design and Build Sub-Contract is made up of two parts: the Sub-Contract Agreement (DBSub/A) which includes the Recitals, Articles and Sub-Contract Particulars, and the Sub-Contract Conditions (DBSub/C).

The Design and Build Sub-Contract Agreement is appropriate where:
The Design and Build Sub-Contract is made up of two parts: the Sub-Contract Conditions (DBSub/C) should be used in conjunction with the Sub-Contract Agreement (DBSub/A) which includes the Recitals, Articles and Sub-Contract Particulars.
It can only be used when the main contract is the Design and Build Contract.
It can be used where the sub-contracted works are fully designed, or if the sub-contractor is required to design all or a part of the works.
It can be used when either the main contract works or the sub-contract works are to be carried out in sections.
It can be used for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc.) or by complete remeasurement.
Provisions are included for collaborative working, sustainability and bonds (off-site materials and retention).

With JCTs New Rules of Measurement Update, users can use NRM2 instead of SMM7 under this contract.

USEFUL DOCUMENTS
Contents page

Price: 57.07+VAT

Share your knowledge of this product with other customers... Be the first to write a review

Browse for more products in the same category as this item:

JCT Contracts > JCT 2016 Contracts
JCT Contracts > JCT 2016 Contracts > Design and Build
JCT Contracts
Design & Build Contracts
Sub-Contracts