ISBN: 9780727762092 Format: Paperbound Publish Date: 22/06/2017 Publisher: Thomas Telford Ltd Number of Pages: 120
NEC4 CONTRACTS
The NEC4 Engineering and Construction Contract (ECC) has been developed to be used in the engineering, building and construction industries.
From major infrastructure projects to highways construction, NEC4 enables you to deliver projects on time, on budget and to the highest standards.
This contract should be used for the appointment of a contractor for engineering and construction work, including any level of design responsibility.
A short version of the contract is also available for less sophisticated projects, alongside the subcontract, how to guides, guidance notes and flow charts to help users get the most out of the contract.
This is the core document from which the options A-F are extracted. It contains all core clauses and secondary option clauses, together with the schedules of cost components and forms for contract data.
Price: £85.00
- Core Clauses
1 General 2 The Contractor’s main responsibilities 3 Time 4 Quality management 5 Payment 6 Compensation events 7 Title 8 Liabilities and insurance 9 Termination Main Option Clauses Option A: Priced contract with activity schedule Option B: Priced contract with bill of quantities Option C: Target contract with activity schedule Option D: Target contract with bill of quantities Option E: Cost reimbursable contract Option F: Management contract Resolving and Avoiding Disputes Option W1 Option W2 Option W3 Secondary Option Clauses Option X1: Price adjustment for inflation (used only with Options A, B, C and D) Option X2: Changes in the law Option X3: Multiple currencies (used only with Options A and B) Option X4: Ultimate holding company guarantee Option X5: Sectional Completion Option X6: Bonus for early Completion Option X7: Delay damages Option X8: Undertakings to the Client or Others Option X9: Transfer of rights Option X10: Information modelling Option X11: Termination by the Client Option X12: Multiparty collaboration (not used with Option X20) Option X13: Performance bond Option X14: Advanced payment to the Contractor 59Option X15: The Contractor’s design Option X16: Retention (not used with Option F) Option X17: Low performance damages Option X18: Limitation of liability Option X20: Key Performance Indicators (not used with Option X12) Option X21: Whole life cost Option X22: Early Contractor involvement (used only with Options C and E) Note Option X19 is not used Option Y(UK)1: Project Bank Account Option Y(UK)2: The Housing Grants, Construction and Regeneration Act 1996 Option Y(UK)3: The Contracts (Rights of Third Parties) Act 1999 Option Z: Additional conditions of contract Schedule of Cost Components Short Schedule of Cost Components Contract Data Part one – Data provided by the Client Part two – Data provided by the Contractor Index
|
|
 |